So, right now, I'm a week into production of "The Exploding Girl", an indie feature directed by Brad Gray and produced by Ben Howe and Karin Chien. This is my first gig as 2nd AC, and I'm really enjoying it. Since we're shooting on the RED ONE, my job doesn't really involve loading mags or unloading, but rather slinging huge files around huger hard drives, and making sure the batteries are fully charged. And that camera CHEWS through batteries like nobody's business.
Anyway, production on the video is at a standstill during this time, but I'm excited to begin work again in September, when I'll need to purchase the latest 3ds max software. If anybody would like to contribute, of course, the donation link will hopefully still work. You can also buy copies of the old albums, because I know that far fewer people have these than should. Anyway, I'm excited to say that the majority of the behinds the scenes work on the video is done, and what is left at this point is making shit happen. Well, provided that the 3ds max upgrade comes off without a hitch.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment